References
Despite careful examination, we can not accept any liability for the content of the linked page.
The logos of our reference links are under the copyright of their respective companies and are used for visualization. Change requests and suggestions please send an e-mail:
info (@) betonboden.de
| Weblink | Object | Work carried out | Area |
| Weblink | Shopping center and parking garages Neue Mitte Oberhausen | Concrete floor plate inserted and smoothed | 150,000 m² |
| Skate Park "on the mountain Helker" Billerbeck | Special concrete slope fitted with variable angle and smoothed | | |
| Weblink | Bochum Ruhr Park shopping center | Gradients and smoothed concrete was installed | 3,000 m² |
| Stone Works Klostermann Coesfeld | Concrete floor and rubbed hard material wear layer and smoothed | 4,000 m² | |
| University Clinic Bochum Bergmannsheil parking deck | Concrete floor slab in a three-sided surface slope to unity smoothed | 800 m² |
| Weblink | DEA gas station Wuppertal | Concrete floor slab to § 19 WHG, BII monitored | 450 m² |
| German Saatveredelung Lippstadt | Indoor and outdoor concrete surfaces Splitteinstreuung | 4,000 m² |
| Rüttgers chemistry Castrop-Rauxel | Liquid-proof concrete with 10mm hard coating | 1500 m² |
| Car pepper Recklinghausen | Concrete floor installed with hard coating, surface smoothed | 700 m² |
| Weblink | Goldschmidt AG, Essen storage area | Polymer-modified industrial screed | 3,000 m² |
| Forwarding hall Bottrop | Concrete floor installed in accordance with § 19 WHG appropriate height and smoothed | 5,000 m² | |
| Weblink | Ruhrkohle Education Society | Steel fiber concrete as a topping (including land reclamation hard material and smoothing) | 400 m² |
| Weblink | Thyssen AG Schwelgern | Colored concrete floor in the factory | 950 m² |
| Multiplex cinema Duisburg | Concrete floor installed, rubbed and smoothed | 4,500 m² |
| Central warehouse RCG return Witt | Indoor and outdoor space including concrete and smoothing Hartstoffeinstreuung | 18,000 m² |
| Weblink | Huls AG, Witten | Concrete floor slab with hard coating according to § 19 WHG | 1,100 m² |
| Free gas station RCG Bottrop-Kirchhellen | Concrete floor slab in accordance with § 19 WHG | 400 m² |
| Weblink | Shell station Marbach near Stuttgart | Concrete floor slab with hard coating according to § 19 WHG | 380 m |
| Weblink | Mercedes Benz AG Essen | Polymer-modified hard aggregate screed | 900 m² |
| Society for drive technology Dusseldorf | Concrete floor slab including rubbing and smoothed EPX coating | 1,300 sqm |
| Company hoof Velbert | Aufbetonarbeiten, steel fiber concrete wearing surface with hard material | 600 m² |
| Weblink | BP Wuppertal | BII-concrete storage tank according to WHG § 19 | 400 m² |
| Weblink | ARGE 2000 Airport Dusseldorf | Concrete work in the arrival / departure area | 8,000 sq m |
| Weblink | Plastics Engineering Company Ötztürk Velbert | Renovation of the hall floors, steel fiber concrete and hard material wear layer | 650 m² |
| Hall coach Wuppertal | Concrete floor slab with hard material layer d = 10 mm | 3,500 m² |
| Weblink | Trinkgut Lüdinghausen | Concrete floor slab with hard coating, surface abraded and smoothed | 1,200 m |
| Weblink | Trinkgut Oberhausen | Concrete floor slab with hard coating, surface abraded and smoothed | 1,200 m |
| Cemex Dortmund | Concrete Verladeplatte | 400 m² |
| Nursery Kloer Dorsten | Concrete floor plate inserted and smoothed with Hartstoffeinstreuung | 1,800 m² |
| Weblink | Nursery Brokemper Schermbeck | Concrete floor plate inserted and smoothed with Hartstoffeinstreuung | 2,000 sqm |
| Nursery flowers Heuger Glandorf | Concrete floor plate inserted and smoothed with Hartstoffeinstreuung | 2,500 m² |
| Nursery Aldenhoff Schermbeck | Concrete floor plate inserted and smoothed with Hartstoffeinstreuung | 500 m² | |
| Weblink | Coca Cola Company Dorsten | Steel fiber concrete with Hartstoffeinstreuung | 1,600 m |
| Company Torkret Brunswick | Fine concrete in the composite, smoothed surface | 12,000 m |
| BB Agricultural Cooperative eG Vettweiß | Liquid density base plate according to § 19 WHG | 450 m² |
| Industrial painting Nicnerski Korschenbroich | Steel fiber concrete with hard coating | 1,100 m² | |
| Zoofachmarkt Gelsenkirchen-Buer | Concrete topping | 1,200 m | |
| Heicko screws France | Fine concrete in the composite, smoothed surface | 450 m² |
![]() | Motorway A31 Emden | Four highway bridges: Vacuum concrete surface rubbed and smoothed | 3,500 m² |
| Vestolit Marl | Soil remediation Stelcon / EPX coating (§ 19 WHG) | 400 m² |
| GWB Gelenkwellenbau food | - | 1,200 m |
| Weblink | Degussa Marl | Steel fiber concrete electric motor factory town | 450 m² |
| Phenolic chemistry Gladbeck | - | 450 m² |
| Weblink | Volkswagen dealership Campsite Oberhausen | - | 350 m² |
| Weblink | Opel Bochum | Production line concrete floor slab with hard coating | 500 m² |
| Wilkes Kunstofftechnik Northeim | Steel fiber concrete with hard material DORSIDUR | 1,400 sqm |
| Heine Baugesellschaft Mühlheim | Underground parking floor plate with Hartstoffeinstreuung smoothed | 1,600 m | |
| WDI Gelsenkirchen | Topping production facility, steel fiber concrete smoothed and polished with Hartstoffeinstreuung | 500 m² | |
| Weblink | Mercedes Benz Dortmund | Liquid-tight concrete floor slab rubbed and smoothed | 4,000 m² |
| Bursiek holders | Glass fiber reinforced concrete floor slab to floor heating, surface Quenched | 600 m² | |
| Weblink | E. On nuclear power plant Grafenrheinfeld | Concrete floor slab with Hartstoffeinstreuung | 1,600 m |
| RCG mountain ash | Aaton ® concrete floor with Hartstoffeinstreuung | 1,200 m |
| Weblink | Mercedes Benz / Smart Centre Dortmund | Concrete with Hartstoffeinstreuung | 1,700 m² |
| Weblink | Sasol, Witten | Drum storage: liquid-tight concrete Hartstoffeinstreuung under § WHG19 | 900 m² |
| Weblink | Siemens Duisburg | - | 1,500 m |
| Weblink | 3M Unna | - | 600 m² |
| Weblink | Siemens Mülheim | Concrete floor | 950 m² |
| Weblink | Maxdata Marl | Electrically dissipative with concrete floor heating system | 1,100 m² |
| AGR Herten | Liquid-proof concrete floor | 1,000 m² |
| Weblink | German post-Bonn | Headquarters / Headquarters: topping double bottom with hard material layer and increased accuracy | 600 m² |
| Weblink | Aral Gelsenkirchen | Gas station | 500 m² |
| Halfmann Schermbeck | Steel fiber concrete as a tidal system in nursery | 400 m² | |
| Weblink | QVC Hückelhofen | Soil Remediation | - M |
| Trabrennbahn Hamburg | Special screed in the stands | 1,600 m |
| Stahmö GmbH Raesfeld | Catch basin acc. § 19 WHG | 400 m² | |
| Precast production facility Dorsten, Mark Field Road | Concrete floor slab with Hartstoffeinstreuung | 400 m² | |
| GPI Gladbeck | - | 800 m² |
| Spedition Schmidt Heilbronn Marl | - | 600 m² |
| Weblink | German Postal Frechen | Distribution center: repair of concrete floors, hard material remuneration 10mm DORSIDUR special gem. DIN1100 | 1,000 m² |
| Weblink | LTU Lufttransport-Unternehmen GmbH Dusseldorf Airport | BII-concrete with hard material compensation | 8,000 sq m |
| Electric bucket Brünen | C30/37 concrete floor slab to floor heating with DORSIDUR special hard coating. Rubbed off and smoothed. | 500 m² | |
| Trauma Clinic Duisburg | Helicopter landing platform | |
| Trimet Aluminium AG Essen | Concrete floor slab | 1,500 m |
| Weblink | Evonik GmbH Essen district | Industrial flooring with plastic coating (range: switchgear) | 250 m² |
| Grützmacher GmbH Dorsten-Wulfen | Concrete floor slab | 850 m² | |
| GERMAN STEEL WORKS GmbH Witten | Concrete floor | 400 m² |
| Weblink | Babcock Borsig Voerde | Concrete floor | 9,000 m² |
| Nelskamp Dachziegelwerke GmbH Schermbeck | Concrete floor | 1,000 m² |
| Weblink | Robot chemistry Gelsenkirchen | Concrete sealing liquid according to WHG, floor plate Verladestreifen, redevelopment | 300 m² |
| Weblink | Ikea Dortmund | Concrete floor slab | 15 750 m² |
| Arcades Dusseldorf | Concrete floor with hard coating | 1,500 m |
| Weblink | Satin shoes Dortmund | Liquid-proof concrete WHG, paving, edge protection system | 100 m² |
| Weblink | Metro Unna | Concrete floor outdoor area | 1,500 m |
| Sako Maschinenhandel Dinslaken | Concrete floor slab with hard coating and diamond grinding | 1000 m² |
| Weblink | Entex Bochum | Concrete foundation plate acc. § 19 WHG (liquid tight) | 250 m² |
| Airport Weeze | Storage tank under § WHG19 | 2,600 sqm |
![]() | Haunert flower holders a. See | Concrete floor on loading platforms | 800 m² |
| Weblink | Welser Profiles Bönen | Concrete floor slab loading area with broom finish | 1,200 m |
| Ewald colliery Herten | Concrete floor slab | 1,000 m² |
| German railway Witten | Concrete floor slab (turnout) | 600 m² |
| REWE Dortmund central warehouse | Aufbetonplatte rubbed and smoothed | 1,200 m |
| Gröblinghoff Werne | Concrete floor slab / d = 40-50cm | 650 m² |
| Weblink | Somplatzki container Herten | Concrete floor slab with Hartstoffeinsteuung | 1,800 m² |
| Bunzel Marl | Concrete floor slab for prefab house | 150 m² | |
| Eickhoff Bochum | EPX coating | 800 m² | |
| Kötters Wulfen | Concrete floor slab with hard coating | 2,500 m² |
| Michele Recklinghausen | 600 m² | ||
| Biomedicine (BMZ) Bonn | black-industry screed | 1,000 m² | |
| Amand Ratingen | Hall / stabilization of courtyards. Liquid-proof concrete according to § 19 WHG | 6,000 m² |
| Flowers West Südlohn | Concrete roads in the area of large greenhouses, steel fiber concrete with Hartstoffverschleisschicht, rubbed and smoothed surface | 11,500 m² | |
| David Stair Hamburg St. Pauli | Special concrete with high abrasion resistance in the area steps and landings built smoothed, and fitted with a broom finish. Concrete colored with iron oxide | 160 m² | |
| Skatepark Gevelsberg | Skate Park Precast concrete-lined, worn down and smoothed | 578 m² |